2019 Latest Design High Dexterity Work Gloves - ITEM NO. PV503 – Handprotect Detail:
Name : Knit Wrist PVC Glove with Towel Liner
Item No.:PV503
PRODUCT DETAILS:
Available Sizes | 9/10/11 |
Coating Material | PVC |
Construction | Sewn |
Cuff Style | Knit Wrist |
Gauge | N/A |
Length | 24/25/26cm |
Color | Red/ Brown |
Liner Material | Interlock on back
Towel Liner on Palm |
PACKING:
- 12 pairs in a bag; 72pairs in a carton
STANDARDS AND CERTIFICATIONS:
- EN388 4242
INDUSTRIES:
Machinery and Equipment
- Chemical
- Metal fabrication
- Automotive
- Mining
- Oil and gas
Product detail pictures:
Related Product Guide:
We rely upon strategic thinking, constant modernisation in all segments, technological advances and of course upon our employees that directly participate in our success for 2019 Latest Design High Dexterity Work Gloves - ITEM NO. PV503 – Handprotect, The product will supply to all over the world, such as: San Diego , South Korea , Colombia , With a wide range, good quality, reasonable prices and stylish designs, our items are extensively used in this field and other industries. We welcome new and old customers from all walks of life to contact us for future business relationships and achieving mutual success! We welcome customers, business associations and friends from all parts of the world to contact us and seek cooperation for mutual benefits.
1.Is samples could supply? Is it free or charge cost? What is the delivery time .
Answer: Yes, we would like supply samples as your request.
General samples are free for 2-3pairs each model. Lead time 2-3days.
If your samples need customized such as special material, with logo or others .
it will be depends on the cost,the lead time about 5-7days.
2.Is the products can be with our own logo?
Yes, customized packing is accepted such as logo print, washing label, single OPPbag packing, headcard , carton mark or others.
3.Do you have Minimum Order Quantity ?
Yes, MOQ are from 100dozens-2000dozens for differenct items.
if you have special request or need small quantity for test , pls contact our sales for solution.
4.What is the average lead time?
For mass production, the lead time is general 30 days after receiving the deposit payment.
5.What kinds of payment methods do you accept?
TT, Western Union , Paypal, D/P at sight . Our payment terms are optional .
By TT, 30% deposit in advance, 70% balance against the copy of B/L is our most customers chose. .
By David from Sudan - 2018.12.22 12:52
The enterprise has a strong capital and competitive power, product is sufficient, reliable, so we have no worries on cooperating with them.
By Mavis from Ukraine - 2018.12.10 19:03