China Cheap price Thermal Construction Gloves - ITEM NO. TDMDQ408B-3 – Handprotect Detail:
Name : HPPE Cutting sandy nitrile TPR glove
Item No. :TDMDQ408B-3
PRODUCT DETAILS:
Construction | Mechanical Gloves | Anti-Impact,anti-cutting |
Coating Material | Sandy Nitrile | good grip,excellet Abrasion |
Palm | EVA reinforced | good IMPACT on Palm |
Liner Material | 13 gauge HPPE liner | high performance of cutting |
Back | Quality TPR | impact Resistant on working |
Cuff | Velcro Wrist | Adjustable Cuff make
the gloves wear firm for everybody |
Available Sizes | 6/7/8/9/10/11 | Different sizes for chose |
Length | 22/23/24/25/26cm | Standard Sizes measure |
Color | red/black | Color coustomized available |
PACKING:
- 12 pairs in a bag; 120 pairs in a carton
STANDARDS AND CERTIFICATIONS:
- EN388 :4x43C
INDUSTRIES:
. Metal fabrication
- Automotive
- Mining
- Better Grip
- Mechanical gloves for impact protection
Product detail pictures:
Related Product Guide:
Our target is to consolidate and improve the quality and service of existing products, meanwhile constantly develop new products to meet different customers' demands for China Cheap price Thermal Construction Gloves - ITEM NO. TDMDQ408B-3 – Handprotect, The product will supply to all over the world, such as: Mozambique , Toronto , Orlando , We adopt advanced production equipment and technology, and perfect testing equipment and methods to ensure our product quality. With our high-level talents, scientific management, excellent teams, and attentive service, our products are favored by domestic and foreign customers. With your support, we will build a better tomorrow!
1.Is samples could supply? Is it free or charge cost? What is the delivery time .
Answer: Yes, we would like supply samples as your request.
General samples are free for 2-3pairs each model. Lead time 2-3days.
If your samples need customized such as special material, with logo or others .
it will be depends on the cost,the lead time about 5-7days.
2.Is the products can be with our own logo?
Yes, customized packing is accepted such as logo print, washing label, single OPPbag packing, headcard , carton mark or others.
3.Do you have Minimum Order Quantity ?
Yes, MOQ are from 100dozens-2000dozens for differenct items.
if you have special request or need small quantity for test , pls contact our sales for solution.
4.What is the average lead time?
For mass production, the lead time is general 30 days after receiving the deposit payment.
5.What kinds of payment methods do you accept?
TT, Western Union , Paypal, D/P at sight . Our payment terms are optional .
By TT, 30% deposit in advance, 70% balance against the copy of B/L is our most customers chose. .
By Lorraine from Singapore - 2017.06.22 12:49
As an international trading company, we have numerous partners, but about your company, I just want to say, you are really good, wide range, good quality, reasonable prices, warm and thoughtful service, advanced technology and equipment and workers have professional training, feedback and product update is timely, in short, this is a very pleasant cooperation, and we look forward to the next cooperation!
By Linda from USA - 2017.06.22 12:49