Factory selling Cotton Protective Gloves - ITEM NO. DQM708BD – Handprotect Detail:
Name : Nitrile Micro-Foam Dotted Glove
15 gauge nylon&lycra liner, Nitrile Micro-foam palm coated, with nitrile dotted
Item No.:DQM708BD
PRODUCT DETAILS:
Available Sizes | 6/7/8/9/10/11 |
Coating Material | Nitrile Micro-Foam+Nitrile Dotted |
Construction | Knitted |
Cuff Style | Knitwrist |
Fishing | Palm Coated |
Gauge | 15 gauge |
Length | 22/23/24/25/26cm |
Color | Grey/Black |
Liner Material | Nylon+lycra |
PACKING:
- 12 pairs in a bag; 10 bags in a carton
STANDARDS AND CERTIFICATIONS:
- EN388 3122
INDUSTRIES:
- Machinery and Equipment
- Chemical
- Metal fabrication
- Automotive
- Mining
- Oil and gas
Product detail pictures:
Related Product Guide:
Our staff through skilled training. Skilled skilled knowledge, potent sense of company, to satisfy the provider requirements of consumers for Factory selling Cotton Protective Gloves - ITEM NO. DQM708BD – Handprotect, The product will supply to all over the world, such as: America , United Arab Emirates , Vancouver , We hope we can establish long-term cooperation with all of the customers. And hope we can improve competitiveness and achieve the win-win situation together with the customers. We sincerely welcome the customers from all over the world to contact us for anything you need!
1.Is samples could supply? Is it free or charge cost? What is the delivery time .
Answer: Yes, we would like supply samples as your request.
General samples are free for 2-3pairs each model. Lead time 2-3days.
If your samples need customized such as special material, with logo or others .
it will be depends on the cost,the lead time about 5-7days.
2.Is the products can be with our own logo?
Yes, customized packing is accepted such as logo print, washing label, single OPPbag packing, headcard , carton mark or others.
3.Do you have Minimum Order Quantity ?
Yes, MOQ are from 100dozens-2000dozens for differenct items.
if you have special request or need small quantity for test , pls contact our sales for solution.
4.What is the average lead time?
For mass production, the lead time is general 30 days after receiving the deposit payment.
5.What kinds of payment methods do you accept?
TT, Western Union , Paypal, D/P at sight . Our payment terms are optional .
By TT, 30% deposit in advance, 70% balance against the copy of B/L is our most customers chose. .
By Nelly from Dubai - 2017.09.26 12:12
Managers are visionary, they have the idea of "mutual benefits, continuous improvement and innovation", we have a pleasant conversation and Cooperation.
By Sophia from Malawi - 2018.12.25 12:43