Factory selling Welding Gloves - ITEM NO. DMPU608BC-18 – Handprotect Detail:
18 gauge CARBON/NYLONE flexible ESD PU glove-CUTTING
Item No.:DMPU608BC-18
PRODUCT DETAILS:
Available Sizes | 6/7/8/9/10/11” |
Coating Material | PU |
Construction | Knitted |
Cuff Style | Knit Wrist |
Finish | Palm Coated |
Length | 22/23/24/25/26/27cm |
Liner Material | 18 gauge carbon/HPPE liner |
Feature | ESD, Anti-Cutting level B |
FEATURE
- Super comfortable, fit hands like a second skin
- ESD gloves -anti-static glove
- Anti-cutting level B ,level 3
- soft and comfortable grip
- Excellent grip and touch
PACKING:
- 12 pairs in a bag; 12 bags in a carton
STANDARDS AND CERTIFICATIONS:
- EN388:2016 4131
- EN16350:2014
INDUSTRIES:
- Automotive
- Laboratory
- dust-free room
- Electrical factory
- Electrical components assembly&installation
Product detail pictures:



Related Product Guide:
We always think and practice corresponding to the change of circumstance, and grow up. We aim at the achievement of a richer mind and body and the living for Factory selling Welding Gloves - ITEM NO. DMPU608BC-18 – Handprotect, The product will supply to all over the world, such as: Belarus , Bangladesh , Estonia , Our company has abundant strength and possesses a steady and perfect sales network system. We wish we could establish sound business relationships with all customers from at home and abroad on the basis of mutual benefits.
1.Is samples could supply? Is it free or charge cost? What is the delivery time .
Answer: Yes, we would like supply samples as your request.
General samples are free for 2-3pairs each model. Lead time 2-3days.
If your samples need customized such as special material, with logo or others .
it will be depends on the cost,the lead time about 5-7days.
2.Is the products can be with our own logo?
Yes, customized packing is accepted such as logo print, washing label, single OPPbag packing, headcard , carton mark or others.
3.Do you have Minimum Order Quantity ?
Yes, MOQ are from 100dozens-2000dozens for differenct items.
if you have special request or need small quantity for test , pls contact our sales for solution.
4.What is the average lead time?
For mass production, the lead time is general 30 days after receiving the deposit payment.
5.What kinds of payment methods do you accept?
TT, Western Union , Paypal, D/P at sight . Our payment terms are optional .
By TT, 30% deposit in advance, 70% balance against the copy of B/L is our most customers chose. .

The company has a good reputation in this industry, and finally it tured out that choose them is a good choice.
