Factory source Warm Waterproof Work Gloves - ITEM NO. PU608BC – Handprotect Detail:
13 gauge CARBON/NYLONE ESD PU glove
Item No.:PU608BC
PRODUCT DETAILS:
Available Sizes | 6/7/8/9/10/11” |
Coating Material | PU |
Construction | Knitted |
Cuff Style | Knit Wrist |
Finish | Palm Coated |
Length | 22/23/24/25/26/27cm |
Liner Material | 13 gauge carbon/nylon liner |
Feature | ESD |
FEATURE
- ESD gloves -anti-static glove
- soft and comfortable grip
- Excellent grip and touch
PACKING:
- 12 pairs in a bag; 12 bags in a carton
STANDARDS AND CERTIFICATIONS:
- EN388:2016 4131
- EN16350:2014
INDUSTRIES:
- Automotive
- Laboratory
- dust-free room
- Electrical factory
- Electrical components assembly&installation
Product detail pictures:
Related Product Guide:
With this motto in mind, we have become one of the most technologically innovative, cost-efficient, and price-competitive manufacturers for Factory source Warm Waterproof Work Gloves - ITEM NO. PU608BC – Handprotect, The product will supply to all over the world, such as: Chile , New Delhi , Tanzania , Many goods fully conform to the most rigorous of international guidelines and with our first-rate delivery service you will have them delivered at any time and in any place. And because Kayo deals in the entire spectrum of protective equipment, our customers don't have to waste time shopping around.
1.Is samples could supply? Is it free or charge cost? What is the delivery time .
Answer: Yes, we would like supply samples as your request.
General samples are free for 2-3pairs each model. Lead time 2-3days.
If your samples need customized such as special material, with logo or others .
it will be depends on the cost,the lead time about 5-7days.
2.Is the products can be with our own logo?
Yes, customized packing is accepted such as logo print, washing label, single OPPbag packing, headcard , carton mark or others.
3.Do you have Minimum Order Quantity ?
Yes, MOQ are from 100dozens-2000dozens for differenct items.
if you have special request or need small quantity for test , pls contact our sales for solution.
4.What is the average lead time?
For mass production, the lead time is general 30 days after receiving the deposit payment.
5.What kinds of payment methods do you accept?
TT, Western Union , Paypal, D/P at sight . Our payment terms are optional .
By TT, 30% deposit in advance, 70% balance against the copy of B/L is our most customers chose. .
By Irene from South Korea - 2018.06.18 17:25
This supplier's raw material quality is stable and reliable, has always been in accordance with the requirements of our company to provide the goods that quality meet our requirements.
By Belinda from Ethiopia - 2018.06.30 17:29