Good Quality Heavy Duty Rubber Gloves - ITEM NO. DQ408N – Handprotect Detail:
Nitrile double dipped Glove
Item No.:DQ408N
PRODUCT DETAILS:
Available Sizes | 7/8/9/10/11” |
Coating Material | Smooth Nitrile fully coated(inner)+Sandy Nitrile Palm coated (outer) |
Construction | Knitted |
Cuff Style | Knited Wrist |
Finish | fully coated |
Length | 22/23/24/25/26cm |
Color | Blue+Black |
Liner Material | 15 Gauge Nylon Liner |
FEATURE&ADVANTAGE:
- Excellent abrasion and grip in wet and heavy oily condition
- Fully coating brings long lasting service life
- confortable ware
PACKING:
- 12 pairs in a bag; 12 bags in a carton
STANDARDS AND CERTIFICATIONS:
EN388:2016: 4131
APPLICATIONS:
.Final Assembly areas
. General Material handling
.Assembling, inspecting and packing small or delicate parts
.Assembly working in oil conditions
Product detail pictures:


Related Product Guide:
Sticking towards the principle of "Super High-quality, Satisfactory service" ,We've been striving to become a superb business partner of you for Good Quality Heavy Duty Rubber Gloves - ITEM NO. DQ408N – Handprotect, The product will supply to all over the world, such as: Rwanda , Namibia , Tajikistan , We strive for excellence, constant improvement and innovation, is committed to make us the "customer trust" and the "first choice of engineering machinery accessories brand" suppliers. Choose us, sharing a win-win situation!
1.Is samples could supply? Is it free or charge cost? What is the delivery time .
Answer: Yes, we would like supply samples as your request.
General samples are free for 2-3pairs each model. Lead time 2-3days.
If your samples need customized such as special material, with logo or others .
it will be depends on the cost,the lead time about 5-7days.
2.Is the products can be with our own logo?
Yes, customized packing is accepted such as logo print, washing label, single OPPbag packing, headcard , carton mark or others.
3.Do you have Minimum Order Quantity ?
Yes, MOQ are from 100dozens-2000dozens for differenct items.
if you have special request or need small quantity for test , pls contact our sales for solution.
4.What is the average lead time?
For mass production, the lead time is general 30 days after receiving the deposit payment.
5.What kinds of payment methods do you accept?
TT, Western Union , Paypal, D/P at sight . Our payment terms are optional .
By TT, 30% deposit in advance, 70% balance against the copy of B/L is our most customers chose. .

The factory can meet continuously developing economic and market needs, so that their products are widely recognized and trusted, and that's why we chose this company.
