Manufacturer for Heavy Duty Heat Resistant Gloves - ITEM NO. DQ401 – Handprotect Detail:
Name : SANDY FINISH heavy duty nitrile glove
Item No.:DQ401
PRODUCT DETAILS:
Available Sizes | 9/10/11 |
Coating Material | SANDY Nitrile |
Construction | CUT&SEWN |
Cuff Style | Knitwrist |
Fishing | Fully Coated |
Gauge | N/A |
Length | 25/26/27cm |
Color | Blue |
Liner Material | Jersey Liner |
FEATURE:
- Jersey liner keep more warm than cotton liner
- heavy duty nitrile fully coated for oily and wet enviorment
- SANDY nitirle provide excellent grip
PACKING:
- 12 pairs in a bag; 10 bags in a carton
STANDARDS AND CERTIFICATIONS:
- EN388 4121
INDUSTRIES:
- Machinery and Equipment
- Chemical
- Metal fabrication
- Automotive
- Mining
- Oil and gas
Product detail pictures:
Related Product Guide:
We have many excellent staff members good at marketing, QC, and dealing with kinds of troublesome problem in the production process for Manufacturer for Heavy Duty Heat Resistant Gloves - ITEM NO. DQ401 – Handprotect, The product will supply to all over the world, such as: Niger , Jamaica , Durban , We are proud to supply our products to every auto fan all around the world with our flexible, fast efficient services and strictest quality control standard which has always approved and praised by customers.
1.Is samples could supply? Is it free or charge cost? What is the delivery time .
Answer: Yes, we would like supply samples as your request.
General samples are free for 2-3pairs each model. Lead time 2-3days.
If your samples need customized such as special material, with logo or others .
it will be depends on the cost,the lead time about 5-7days.
2.Is the products can be with our own logo?
Yes, customized packing is accepted such as logo print, washing label, single OPPbag packing, headcard , carton mark or others.
3.Do you have Minimum Order Quantity ?
Yes, MOQ are from 100dozens-2000dozens for differenct items.
if you have special request or need small quantity for test , pls contact our sales for solution.
4.What is the average lead time?
For mass production, the lead time is general 30 days after receiving the deposit payment.
5.What kinds of payment methods do you accept?
TT, Western Union , Paypal, D/P at sight . Our payment terms are optional .
By TT, 30% deposit in advance, 70% balance against the copy of B/L is our most customers chose. .
By Helen from Mexico - 2018.09.16 11:31
The factory technical staff gave us a lot of good advice in the cooperation process, this is very good, we are very grateful.
By Victor from Bangalore - 2018.09.29 13:24