New Fashion Design for Rubber Coated Cotton Gloves - ITEM NO. PU608BC-fingertips – Handprotect Detail:
13 gauge CARBON/NYLONE ESD PU glove
Item No.:PU608BC-fingers
PRODUCT DETAILS:
Available Sizes | 6/7/8/9/10/11” |
Coating Material | PU |
Construction | Knitted |
Cuff Style | Knit Wrist |
Finish | Finger tips coated |
Length | 22/23/24/25/26/27cm |
Liner Material | 13 gauge carbon fiber liner |
Feature | ESD |
FEATURE
- ESD gloves -anti-static glove
- Flexible and high dexterity
- soft and comfortable grip
- Excellent grip and touch
PACKING:
- 12 pairs in a bag; 12 bags in a carton
STANDARDS AND CERTIFICATIONS:
- EN388:2016 4131
- EN16350:2014
INDUSTRIES:
- Automotive
- Laboratory
- dust-free room
- Electrical factory
- Electrical components assembly&installation
Product detail pictures:
Related Product Guide:
No matter new customer or old customer, We believe in long term and trusted relationship for New Fashion Design for Rubber Coated Cotton Gloves - ITEM NO. PU608BC-fingertips – Handprotect, The product will supply to all over the world, such as: Bulgaria , Hongkong , Serbia , We have advanced production technology, and pursuit innovative in goods. At the same time, the good service has enhanced the good reputation. We believe that as long as you understand our product, you need to be willing to become partners with us. Looking forward to your inquiry.
1.Is samples could supply? Is it free or charge cost? What is the delivery time .
Answer: Yes, we would like supply samples as your request.
General samples are free for 2-3pairs each model. Lead time 2-3days.
If your samples need customized such as special material, with logo or others .
it will be depends on the cost,the lead time about 5-7days.
2.Is the products can be with our own logo?
Yes, customized packing is accepted such as logo print, washing label, single OPPbag packing, headcard , carton mark or others.
3.Do you have Minimum Order Quantity ?
Yes, MOQ are from 100dozens-2000dozens for differenct items.
if you have special request or need small quantity for test , pls contact our sales for solution.
4.What is the average lead time?
For mass production, the lead time is general 30 days after receiving the deposit payment.
5.What kinds of payment methods do you accept?
TT, Western Union , Paypal, D/P at sight . Our payment terms are optional .
By TT, 30% deposit in advance, 70% balance against the copy of B/L is our most customers chose. .
By Tina from Afghanistan - 2018.09.29 17:23
The enterprise has a strong capital and competitive power, product is sufficient, reliable, so we have no worries on cooperating with them.
By Ada from Iceland - 2017.09.28 18:29