OEM Factory for Workwear Gloves - ITEM NO. DMPU608BC-18 – Handprotect Detail:
18 gauge CARBON/NYLONE flexible ESD PU glove-CUTTING
Item No.:DMPU608BC-18
PRODUCT DETAILS:
Available Sizes | 6/7/8/9/10/11” |
Coating Material | PU |
Construction | Knitted |
Cuff Style | Knit Wrist |
Finish | Palm Coated |
Length | 22/23/24/25/26/27cm |
Liner Material | 18 gauge carbon/HPPE liner |
Feature | ESD, Anti-Cutting level B |
FEATURE
- Super comfortable, fit hands like a second skin
- ESD gloves -anti-static glove
- Anti-cutting level B ,level 3
- soft and comfortable grip
- Excellent grip and touch
PACKING:
- 12 pairs in a bag; 12 bags in a carton
STANDARDS AND CERTIFICATIONS:
- EN388:2016 4131
- EN16350:2014
INDUSTRIES:
- Automotive
- Laboratory
- dust-free room
- Electrical factory
- Electrical components assembly&installation
Product detail pictures:
Related Product Guide:
By using a full scientific excellent administration method, great quality and fantastic religion, we get good reputation and occupied this discipline for OEM Factory for Workwear Gloves - ITEM NO. DMPU608BC-18 – Handprotect, The product will supply to all over the world, such as: Egypt , Peru , Bhutan , We adopted technique and quality system management, based on "customer orientated, reputation first, mutual benefit, develop with joint efforts", welcome friends to communicate and cooperate from all over the world.
1.Is samples could supply? Is it free or charge cost? What is the delivery time .
Answer: Yes, we would like supply samples as your request.
General samples are free for 2-3pairs each model. Lead time 2-3days.
If your samples need customized such as special material, with logo or others .
it will be depends on the cost,the lead time about 5-7days.
2.Is the products can be with our own logo?
Yes, customized packing is accepted such as logo print, washing label, single OPPbag packing, headcard , carton mark or others.
3.Do you have Minimum Order Quantity ?
Yes, MOQ are from 100dozens-2000dozens for differenct items.
if you have special request or need small quantity for test , pls contact our sales for solution.
4.What is the average lead time?
For mass production, the lead time is general 30 days after receiving the deposit payment.
5.What kinds of payment methods do you accept?
TT, Western Union , Paypal, D/P at sight . Our payment terms are optional .
By TT, 30% deposit in advance, 70% balance against the copy of B/L is our most customers chose. .
By Kelly from Iraq - 2018.12.10 19:03
Production management mechanism is completed, quality is guaranteed, high credibility and service let the cooperation is easy, perfect!
By Poppy from Chicago - 2018.12.11 11:26