OEM Supply Construction Work Gloves - ITEM NO. DMPU608BC-18 – Handprotect Detail:
18 gauge CARBON/NYLONE flexible ESD PU glove-CUTTING
Item No.:DMPU608BC-18
PRODUCT DETAILS:
Available Sizes | 6/7/8/9/10/11” |
Coating Material | PU |
Construction | Knitted |
Cuff Style | Knit Wrist |
Finish | Palm Coated |
Length | 22/23/24/25/26/27cm |
Liner Material | 18 gauge carbon/HPPE liner |
Feature | ESD, Anti-Cutting level B |
FEATURE
- Super comfortable, fit hands like a second skin
- ESD gloves -anti-static glove
- Anti-cutting level B ,level 3
- soft and comfortable grip
- Excellent grip and touch
PACKING:
- 12 pairs in a bag; 12 bags in a carton
STANDARDS AND CERTIFICATIONS:
- EN388:2016 4131
- EN16350:2014
INDUSTRIES:
- Automotive
- Laboratory
- dust-free room
- Electrical factory
- Electrical components assembly&installation
Product detail pictures:
Related Product Guide:
Our progress depends around the innovative machines, great talents and consistently strengthened technology forces for OEM Supply Construction Work Gloves - ITEM NO. DMPU608BC-18 – Handprotect, The product will supply to all over the world, such as: Sierra Leone , Bangladesh , Mauritania , "Good quality and reasonable price" are our business principles. If you are interested in our products or have any questions, make sure you feel free to contact us. We hope to establish cooperative relationships with you in the near future.
1.Is samples could supply? Is it free or charge cost? What is the delivery time .
Answer: Yes, we would like supply samples as your request.
General samples are free for 2-3pairs each model. Lead time 2-3days.
If your samples need customized such as special material, with logo or others .
it will be depends on the cost,the lead time about 5-7days.
2.Is the products can be with our own logo?
Yes, customized packing is accepted such as logo print, washing label, single OPPbag packing, headcard , carton mark or others.
3.Do you have Minimum Order Quantity ?
Yes, MOQ are from 100dozens-2000dozens for differenct items.
if you have special request or need small quantity for test , pls contact our sales for solution.
4.What is the average lead time?
For mass production, the lead time is general 30 days after receiving the deposit payment.
5.What kinds of payment methods do you accept?
TT, Western Union , Paypal, D/P at sight . Our payment terms are optional .
By TT, 30% deposit in advance, 70% balance against the copy of B/L is our most customers chose. .
By Deirdre from Jamaica - 2017.02.18 15:54
The supplier abide the theory of "quality the basic, trust the first and management the advanced" so that they can ensure a reliable product quality and stable customers.
By Jo from Ireland - 2017.10.27 12:12