One of Hottest for Industrial Gloves - ITEM NO. PV411 – Handprotect Detail:
Name : PVC Sandy Finish Gauntlet
Item No.:PV411
PRODUCT DETAILS:
Available Sizes | 9/10/11 |
Coating Material | Sandy PVC |
Construction | CUT&SEWN |
Cuff Style | GUANTLET |
Fishing | Fully Coated |
Gauge | N/A |
Length | 27/35/40/45cm |
Color | Green/Blue |
Liner Material | Jersey Liner |
PACKING:
- 12 pairs in a bag; 72 pairs in a carton
STANDARDS AND CERTIFICATIONS:
- EN388 4121
EN374
INDUSTRIES:
- Machinery and Equipment
- Chemical
- Metal fabrication
- Automotive
- Mining
- Oil and gas
Product detail pictures:
Related Product Guide:
We also present product or service sourcing and flight consolidation products and services. We have our possess manufacturing facility and sourcing place of work. We can easily supply you with almost every type of product or service connected to our item variety for One of Hottest for Industrial Gloves - ITEM NO. PV411 – Handprotect, The product will supply to all over the world, such as: South Africa , Slovenia , Porto , Our monthly output is more than 5000pcs. We have set up a strict quality control system. Please feel free to contact us for further information. We hope that we can establish long-term business relationships with you and carry out business on a mutually beneficial basis. We are and will be always trying our best to serve you.
1.Is samples could supply? Is it free or charge cost? What is the delivery time .
Answer: Yes, we would like supply samples as your request.
General samples are free for 2-3pairs each model. Lead time 2-3days.
If your samples need customized such as special material, with logo or others .
it will be depends on the cost,the lead time about 5-7days.
2.Is the products can be with our own logo?
Yes, customized packing is accepted such as logo print, washing label, single OPPbag packing, headcard , carton mark or others.
3.Do you have Minimum Order Quantity ?
Yes, MOQ are from 100dozens-2000dozens for differenct items.
if you have special request or need small quantity for test , pls contact our sales for solution.
4.What is the average lead time?
For mass production, the lead time is general 30 days after receiving the deposit payment.
5.What kinds of payment methods do you accept?
TT, Western Union , Paypal, D/P at sight . Our payment terms are optional .
By TT, 30% deposit in advance, 70% balance against the copy of B/L is our most customers chose. .
By Ruby from Montpellier - 2018.07.12 12:19
After the signing of the contract, we received satisfactory goods in a short term, this is a commendable manufacturer.
By Myrna from Ukraine - 2017.06.22 12:49