Popular Design for Protective Work Gloves - ITEM NO. PV411 – Handprotect Detail:
Name : PVC Sandy Finish Gauntlet
Item No.:PV411
PRODUCT DETAILS:
Available Sizes | 9/10/11 |
Coating Material | Sandy PVC |
Construction | CUT&SEWN |
Cuff Style | GUANTLET |
Fishing | Fully Coated |
Gauge | N/A |
Length | 27/35/40/45cm |
Color | Green/Blue |
Liner Material | Jersey Liner |
PACKING:
- 12 pairs in a bag; 72 pairs in a carton
STANDARDS AND CERTIFICATIONS:
- EN388 4121
EN374
INDUSTRIES:
- Machinery and Equipment
- Chemical
- Metal fabrication
- Automotive
- Mining
- Oil and gas
Product detail pictures:
Related Product Guide:
Our pursuit and company intention is usually to "Always fulfill our purchaser requirements". We go on to acquire and layout excellent high quality products for both our previous and new consumers and realize a win-win prospect for our customers too as us for Popular Design for Protective Work Gloves - ITEM NO. PV411 – Handprotect, The product will supply to all over the world, such as: Kenya , Victoria , Philippines , During in 11 years, We have participated in more than 20 exhibitions, obtains the highest praise from each customer. Our company has been devoting that "customer first" and committed to helping customers expand their business, so that they become the Big Boss !
1.Is samples could supply? Is it free or charge cost? What is the delivery time .
Answer: Yes, we would like supply samples as your request.
General samples are free for 2-3pairs each model. Lead time 2-3days.
If your samples need customized such as special material, with logo or others .
it will be depends on the cost,the lead time about 5-7days.
2.Is the products can be with our own logo?
Yes, customized packing is accepted such as logo print, washing label, single OPPbag packing, headcard , carton mark or others.
3.Do you have Minimum Order Quantity ?
Yes, MOQ are from 100dozens-2000dozens for differenct items.
if you have special request or need small quantity for test , pls contact our sales for solution.
4.What is the average lead time?
For mass production, the lead time is general 30 days after receiving the deposit payment.
5.What kinds of payment methods do you accept?
TT, Western Union , Paypal, D/P at sight . Our payment terms are optional .
By TT, 30% deposit in advance, 70% balance against the copy of B/L is our most customers chose. .
By Margaret from Juventus - 2017.06.22 12:49
The goods are very perfect and the company sales manager is warmful, we will come to this company to purchase next time.
By Belle from Accra - 2018.06.05 13:10