Rapid Delivery for Hand Gloves For Water Protection - ITEM NO. PU608BC – Handprotect Detail:
13 gauge CARBON/NYLONE ESD PU glove
Item No.:PU608BC
PRODUCT DETAILS:
Available Sizes | 6/7/8/9/10/11” |
Coating Material | PU |
Construction | Knitted |
Cuff Style | Knit Wrist |
Finish | Palm Coated |
Length | 22/23/24/25/26/27cm |
Liner Material | 13 gauge carbon/nylon liner |
Feature | ESD |
FEATURE
- ESD gloves -anti-static glove
- soft and comfortable grip
- Excellent grip and touch
PACKING:
- 12 pairs in a bag; 12 bags in a carton
STANDARDS AND CERTIFICATIONS:
- EN388:2016 4131
- EN16350:2014
INDUSTRIES:
- Automotive
- Laboratory
- dust-free room
- Electrical factory
- Electrical components assembly&installation
Product detail pictures:
Related Product Guide:
Our pros are lessen prices,dynamic sales team,specialised QC,sturdy factories,top quality services and products for Rapid Delivery for Hand Gloves For Water Protection - ITEM NO. PU608BC – Handprotect, The product will supply to all over the world, such as: Portugal , Libya , Wellington , As the world economic integration bringing challenges and opportunities to the xxx industry, our company , by carrying on our teamwork, quality first, innovation and mutual benefit, are confident enough to provide our clients sincerely with qualified products, competitive price and great service, and to build a brighter future under the spirit of higher, faster, stronger with our friends together by carrying on our discipline.
1.Is samples could supply? Is it free or charge cost? What is the delivery time .
Answer: Yes, we would like supply samples as your request.
General samples are free for 2-3pairs each model. Lead time 2-3days.
If your samples need customized such as special material, with logo or others .
it will be depends on the cost,the lead time about 5-7days.
2.Is the products can be with our own logo?
Yes, customized packing is accepted such as logo print, washing label, single OPPbag packing, headcard , carton mark or others.
3.Do you have Minimum Order Quantity ?
Yes, MOQ are from 100dozens-2000dozens for differenct items.
if you have special request or need small quantity for test , pls contact our sales for solution.
4.What is the average lead time?
For mass production, the lead time is general 30 days after receiving the deposit payment.
5.What kinds of payment methods do you accept?
TT, Western Union , Paypal, D/P at sight . Our payment terms are optional .
By TT, 30% deposit in advance, 70% balance against the copy of B/L is our most customers chose. .
By Daisy from Greenland - 2017.08.16 13:39
The goods we received and the sample sales staff display to us have the same quality, it is really a creditable manufacturer.
By Elaine from Sweden - 2018.05.22 12:13