Well-designed Safety Work Gloves - ITEM NO. PV210 – Handprotect Detail:
Name : Black PVC Gauntlet Glove with Palm chips
Item No.:PV210
Feature: Anti-slip chemical resistant glove
PRODUCT DETAILS:
Available Sizes | 9/10/11” |
Coating Material | PVC with chips enforced |
Construction | Sewn |
Cuff Style | knitwrist |
Dipped | Double |
Length | 24/25/26cm |
Color | Black |
Liner Material | Interlock |
PACKING:
- 12 pairs in a bag; 60pairs in a carton
STANDARDS AND CERTIFICATIONS:
- EN388 4121
INDUSTRIES:
- Machinery and Equipment
- Chemical
- Metal fabrication
- Automotive
- Mining
- Oil and gas
Product detail pictures:
Related Product Guide:
We have been ready to share our knowledge of internet marketing worldwide and recommend you suitable merchandise at most aggressive rates. So Profi Tools present you very best price of money and we are ready to develop alongside one another with Well-designed Safety Work Gloves - ITEM NO. PV210 – Handprotect, The product will supply to all over the world, such as: Juventus , Liberia , Latvia , If you need to have any of our merchandise, or have other items to be produced, make sure you send us your inquiries, samples or in depth drawings. Meanwhile, aiming to develop into an international enterprise group, we look forward to receiving offers for joint ventures and other cooperative projects.
1.Is samples could supply? Is it free or charge cost? What is the delivery time .
Answer: Yes, we would like supply samples as your request.
General samples are free for 2-3pairs each model. Lead time 2-3days.
If your samples need customized such as special material, with logo or others .
it will be depends on the cost,the lead time about 5-7days.
2.Is the products can be with our own logo?
Yes, customized packing is accepted such as logo print, washing label, single OPPbag packing, headcard , carton mark or others.
3.Do you have Minimum Order Quantity ?
Yes, MOQ are from 100dozens-2000dozens for differenct items.
if you have special request or need small quantity for test , pls contact our sales for solution.
4.What is the average lead time?
For mass production, the lead time is general 30 days after receiving the deposit payment.
5.What kinds of payment methods do you accept?
TT, Western Union , Paypal, D/P at sight . Our payment terms are optional .
By TT, 30% deposit in advance, 70% balance against the copy of B/L is our most customers chose. .
By Fernando from Mongolia - 2018.11.28 16:25
The company can think what our think, the urgency of urgency to act in the interests of our position, can be said this is a responsible company, we had a happy cooperation!
By Marian from Greek - 2018.11.22 12:28